Skip to Content, Navigation, or Footer.
Sunday, Aug. 17, 2025
The Setonian

Summer construction for Xavier

The tri-level of Xavier will be closed this summer for renovation work, according to Michael Marconi, project manager for Facilities Engineering.

Caitlin Carroll can be reached at caitlin.carroll@student.shu.edu.

Powered by SNworks Solutions by The State News
All Content © 2025 The Setonian